Laboratory Design

  • Schematic Design:
    RFD assists the design team in developing a scheme responsive to the Owner's requirements, representing the interests of the laboratory functions.

 

  • Design Development:
    The program drawings are developed in detail with the users, and are expanded to include exhaust air requirements, equipment heat gain, piped services requirements, laboratory power requirements, and electrical loads for laboratory equipment.

 

  • Construction Documents:
    RFD prepares laboratory casework, furnishings, fume hoods and exhaust devices, fittings and fixtures, Group 1 equipment, controlled environment rooms, as well as piped and electrical services in the laboratories.

Previous