Engineering, Science & Technology Facilities
University Teknologi Petronas
Kuala Lumpur, Malaysia
|
COMPLETION: 2001
GROSS BUILDING: 1,500,000
NET (ASSIGNABLE) BUILDING: 750,000
|
|
750,000 NSF of laboratory and laboratory support space for a new Engineering, Science, and Technology campus built from the ground up. The 1.5 million GSF campus will contain buildings for Chemical, Mechanical, Civil, and Electrical Engineering, as well as
future Information Technology and Common Science Engineering. This significant project will form the basis for Engineering Education in Malaysia and perhaps in much of the Far East.
|