Skip to Content
MASDAR Institute of Science and Technology (MIST)
MASDAR Institute of Science and Technology (MIST)
MASDAR Institute of Science and Technology (MIST)
MASDAR Institute of Science and Technology (MIST)

MASDAR Institute of Science and Technology (MIST)

Abu Dhabi Future Energy Company | Completed: 2013

About this project

250,000 net square feet of research laboratory space for a new zero-energy zero-carbon footprint campus with a research focus on alternative energy sources, distribution and technology. The project is based on a highly flexible bench laboratory concept which will maximize interaction and collaboration. Specialized assigned support laboratories include laser laboratories, an engine performance laboratory, a gasifier laboratory, and an environmental testing chamber laboratory. Core laboratory facilities include a comprehensive machine/wood shop, an imaging suite, and a cleanroom. The laboratories have been designed using the highest level of sustainability addressing issues such as material sourcing and transport, localized process exhaust systems, and optimization of airflow system operations.

Featured Biomedical Projects

Ready to discuss your next project?

Contact Us